Electrical
Repairs, fixtures, and troubleshooting
Request ServicePreferred condo maintenance vendors. One convenient point of contact for service requests and coordination.
650 NE 32 St, Miami FL 33137
Vendor list and maintenance services specialized for Paraiso Bay Miami in Midtown Miami & Edgewater. CondoVendorList connects residents, landlords, real estate agents, condo associations, and property managers with vetted service providers for this condo building.
Review Paraiso Bay Miami facts, request in-unit maintenance, check access, contractor requirements, and building compliance documents. One point of contact to coordinate service for Paraiso Bay Miami so work follows the building’s rules and approval process.
| Address | 650 NE 32 St, Miami FL 33137 |
|---|---|
| Neighborhood | Midtown Miami & Edgewater |
| Setting | Bayfront |
| Year built | 2018 |
| Stories | 55 |
| Units | 700 |
| Condo Office / Association Phone | 786-369-5254 |
| Condo Maintenance Request | (475) 203-1568 |
Select a service you need, you will find and coordinate a professional familiar with your building.
Repairs, fixtures, and troubleshooting
Request ServiceRepair, diagnostics, and maintenance
Request ServiceKitchen and laundry appliances
Request ServiceFlooring repair and installation
Request ServiceInterior painting, drywall, and touch-ups
Request ServiceRoofing repair and maintenance
Request ServiceWindow repairs and related work
Request ServiceLocks, hardware, and door repairs
Request ServiceGeneral repairs and installations
Request ServiceUrgent repair and response support
Request ServiceLeaks, fixtures, and drain issues
Request ServiceGeneral repairs and installations
Request ServiceStorm prep and protection
Request ServiceFurniture assembly in your unit
Request ServiceLeak response and restoration
Request ServiceRequest service for Junk Removal
Request ServiceRequest service for Closets & Cabinetry
Request ServiceOutdoor and landscaping services
Request ServiceRegular and deep cleaning
Request ServicePest inspection and treatment
Request ServiceBlinds, shades, and curtains
Request ServiceRequest service for Carpet & Upholstery
Request ServiceRequest service for Pre-Sale / Rental Preparation
Request ServiceMove-out support for your condo
Request ServiceMove-in support for your condo
Request ServiceUnit upgrades and improvements
Request ServiceTenant placement support
Request ServiceProperty management coordination
Request ServiceEviction coordination support
Request ServiceRent collection coordination
Request ServiceConnect with a real estate professional
Request ServiceConnect with a real estate professional
Request ServiceLeasing and rental representation
Request ServiceProfessional listing photos
Request ServiceSecurity and access support
Request ServiceAdditional building services
Request ServiceScheduled building and unit inspections
Request ServiceCondo unit inspections
Request ServiceRequest service for Condo Insurance
Request ServiceRequest service for Mortgage & Financing
Request ServiceNo services match your search. Clear the search or choose another category.
Cards list preferred work categories for this building. Vendor names and contacts stay private on this page.
| Work hours |
Monday–Friday, 9:00 a.m.–4:00 p.m. All workers must leave the property by 4:30 p.m. No weekend, holiday, or evening work without prior written consent.
|
|---|---|
| COI requirements |
General liability insurance: minimum $1,000,000.
Name as additional insured: Paraiso Bay Condominium Association, Inc., the Developer (while it maintains an interest), and the Management Company / Shared Facilities Owner as applicable.
Waiver of subrogation is required. Certificates must provide at least 30 days' cancellation notice to the Association.
Workers' compensation as required by Florida law; the Release form also references WC limits of at least $500,000.
|
| Required contractor documents |
Before work begins, submit and obtain approval for:
- Signed Unit Owner Authorization
- Architectural Modification General Regulations and Procedures acknowledgement
- Signed/notarized Contractor Acknowledgement
- Signed Deposit Requirement for Construction Improvements
- Completed Architectural Modification Form
- Plans/drawings/specifications (start/completion dates, delivery schedule, contractor list with contacts, engineering report if slab penetrations)
- Contractor license and certificate of insurance
- Applicable permits / permit applications and Notice of Commencement (filed; copies to Association; display permit on unit door)
- Samples or material qualifications as applicable
- All fees and deposits paid; elevator reserved
- Signed/notarized Release, Indemnification and Hold Harmless Agreement
For hard flooring: Hard Surface Flooring Sound Control Installation Application and Acknowledgement Affidavit, with documented underlayment meeting STC 50 and IIC 50 (without suspended ceiling).
Refundable construction + elevator deposit: $2,000 cashier's check or money order payable to Paraiso Bay Condominium Association, Inc.
|
| Building rules |
Comply with the Declaration and Architectural Modification regulations. No floor/ceiling slab penetration without written Association consent; no chipping hammers/jackhammers/powered equipment to remove slab or ceiling.
Daily cleanup; no debris in common elements or trash chutes — remove trash daily to construction dumpsters.
Protect common elements; place protective coverings at hallway doors during work hours and remove them daily.
No cutting materials on common or limited common elements. Store all materials inside the unit (not on balconies or common areas).
Cover smoke detectors during work and uncover promptly; do not paint/remove emergency speakers or overspray sprinkler heads. Only authorized contractors may shut down or relocate fire sprinklers (permits + fire watch at owner/contractor expense).
No radios/music. PPE required. OSHA compliance required. Licensed plumber for plumbing; no core drilling for plumbing relocation. Contractors may only use the restroom inside the unit being worked on.
Shut domestic water valves at the end of each workday when applicable.
|
| Vendor know-how |
Management reports that the building does not maintain a vendor list. Unit owners select and coordinate their own licensed, insured contractors.
Hard flooring requires documented sound control meeting STC 50 and IIC 50 (without suspended ceiling) and prior written approval. Maintain balcony drainage; do not block weep holes or handrail clearance.
|
| Access instructions |
Entrance and access details are provided to authorized parties when the visit is coordinated.
|
| Check-in |
Check-in procedures vary by building. Confirm the arrival procedure before the visit.
|
| Loading / elevator |
Loading areas and service elevators may require advance scheduling. Confirm availability before bringing equipment or materials.
|
| Parking |
Vendor parking varies by building. Confirm the permitted parking or loading location before arrival.
|
| Contacts / approval |
The appropriate contact and approval steps depend on the work being performed. Confirm authorization before work begins.
|
No declared units are listed for Paraiso Bay Miami yet.
Document titles are shown publicly. Sign in or complete vendor signup to access files, matching the current site policy.
Choose how you would like to request service.